Change History ------------------------------ andros original kwc 07/27/05 Updates for new circuits kwc 01/03/06 Correct labels for circuits 13 and 15 s/Plugs/Receptacles for circuit 2 More description for circuit 25 kwc 01/19/06 Updates for new 220V/30A circuits. 1) circuit 23 moved to 13 2) circuits 10 and 12 moved onto circuit 8 3) circuit 25 receptacle removed 4) 10/12 is now 220V/30A 5) 22/24 is now 220V/30A 6) 23/25 is now 220V/30A ============ Circuit Box ============ 3 Phase Power. 30 circuits On 2/10/2005: A 45/80 amps B 32/80 amps C 20/80 amps 1) MAIN FEED 2) Receptacles 3) MAIN FEED 4) Lights 5) MAIN FEED 6) Receptacles 7) MAIN FEED 8) Receptacles 9) NFS TestBed (lower) 10) With 12, IBM 220V/30A 11) NFS TestBed (upper) 12) With 10, IBM 220V/30A 13) NetApp 2 14) Receptacles 15) CITI Production 16) CITI Production UPS (30A) 17) ASCI 18) Polyserve (30A) 19) ASCI 20) Polyserve (30A) 21) NetApp 2 22) With 24, IBM 220V/30A 23) With 25, IBM Blade 220V/30A 24) With 22, IBM 220V/30A 25) With 23, IBM Blade 220V/30A 26) HVAC 27) NetApp 1 (upper) 28) HVAC 29) NetApp 1 (lower) 30) HVAC ============ Machine Room ============ East | #15 #16 | | #9 #11 | #27 #29 | Fiber Rack | | | | | -----------| Citi | Table | NFS | NetApp 1 | | Production| | TestBed | | | | | | | | IBM | ASCII | NetApp 2 | Polyserve | | | | | | | #10/12 | #17 #19 | #21 #23 | #18 #20 | #22/24 #23/25 for Blade